Fabrication, Installation and Precommissioning of Njaba Pipelines Ends (Process) Facilities-OML-124

Project Details

This project involves the fabrication, installation, and commissioning of key production and gaslift infrastructure at the Njaba location, along with additional tie-ins at Izombe Flowstation. The scope includes:

  1. Manifold & Pigging System Installation:

    • Fabrication and installation of production (GAY-710), test (GAY-720), and gaslift (GAY-730) manifolds.

    • Installation of production pig launcher (KAH-910) and gaslift pig receiver (KAQ-920).

  2. Piping & Instrumentation:

    • Connection of launchers, receivers, and manifolds with all required piping and instrumentation.

    • Fabrication and installation of wellhead flowlines, gaslift piping, and production hook-up spools.

  3. Equipment Installation:

    • Installation of test separator (MBD-110) and fuel gas scrubber (MBF-130).

    • Wellhead Control Panel (WHCP) installation with drop protection.

    • Installation of gas generator, chemical injection units, and a control room/accommodation module.

  4. Utility & Civil Works:

    • Construction of a drain sump with pumps and piping.

    • Fabrication and installation of a water tank stand, utility pumps, and piping.

    • Execution of required civil works, including foundations and layout preparation.

  5. Izombe Flowstation Modifications:

    • Fabrication and installation of pipeline pig receiver, gaslift pipeline pig launcher, and manifold extensions.

  6. Testing & Commissioning:

    • Hydrotesting, Non-Destructive Testing (NDT), coating, inspection, and pre-commissioning.