Fabrication, Installation and Precommissioning of Njaba Pipelines Ends (Process) Facilities-OML-124
Project Details
This project involves the fabrication, installation, and commissioning of key production and gaslift infrastructure at the Njaba location, along with additional tie-ins at Izombe Flowstation. The scope includes:
Manifold & Pigging System Installation:
Fabrication and installation of production (GAY-710), test (GAY-720), and gaslift (GAY-730) manifolds.
Installation of production pig launcher (KAH-910) and gaslift pig receiver (KAQ-920).
Piping & Instrumentation:
Connection of launchers, receivers, and manifolds with all required piping and instrumentation.
Fabrication and installation of wellhead flowlines, gaslift piping, and production hook-up spools.
Equipment Installation:
Installation of test separator (MBD-110) and fuel gas scrubber (MBF-130).
Wellhead Control Panel (WHCP) installation with drop protection.
Installation of gas generator, chemical injection units, and a control room/accommodation module.
Utility & Civil Works:
Construction of a drain sump with pumps and piping.
Fabrication and installation of a water tank stand, utility pumps, and piping.
Execution of required civil works, including foundations and layout preparation.
Izombe Flowstation Modifications:
Fabrication and installation of pipeline pig receiver, gaslift pipeline pig launcher, and manifold extensions.
Testing & Commissioning:
Hydrotesting, Non-Destructive Testing (NDT), coating, inspection, and pre-commissioning.
Hire Us
For Your Next Project
We’ll be excited to work with your on your next project and deliver the best possible.